Law

Netherlands: Besluit activiteiten leefomgeving art. 5.16a-5.16c (data centre reporting)

Dutch rules that make operators of data centres with at least 500 kW installed IT power collect and publish energy-efficiency data every year by 15 May.

  • 5requirementsin our own words
  • 1edition Besluit activiteiten leefomgeving, article 5.16a-c
  • 1places where it is a duty of 30 assessed
  • 18 Oct 2026last checkedat the sources below

Where it applies

It is a duty in 1 of 30 places. The outcome holds under the conditions shown and says nothing about any one site.

WhereOutcomeBasisConditionsAuthority and route
NetherlandsAppliesRequired by law In forceFrom 500 kW (installed IT power) National law for data centres in this country.RVO Filed with: electronic publication facility, by 15 May
Austria, Belgium, Bulgaria, Switzerland, Cyprus, Czechia, Germany, Denmark, Estonia, Spain, Finland, France, United Kingdom, Greece, Croatia, Hungary, Ireland, Italy, Lithuania, Luxembourg, Latvia, Malta, Norway, Poland, Portugal, Romania, Sweden, Slovenia, SlovakiaDoes not applyRequired by law In forceNone stated Law of NL; this country has its own rules (see EED rows).Not stated

What it asks for

5 requirements, each in our own words with the evidence an assessor would expect and who on a site usually owns it. Read the clause itself on the scheme owner's page.

RequirementEvidence expectedOwnerWhen
Check scope: data centres with at least 500 kW installed IT power; operations wholly for defence or civil-protection tasks are excluded. Applies to: installed IT power of at least 500 kWSite register with installed IT power and any exclusion basis Record, checked by document reviewCompliance manager with Site managerEvery year before each filing Filing, one site
Make energy-efficiency data public through an electronic facility by 15 May each year. Public entry and filing confirmation Record, checked by document reviewCompliance manager with Site managerEvery year 15 May each year Disclosure, one site
Collect and publish the operator name and address, data centre name and address or coordinates, and the other listed items for the previous calendar year. Data sheet matching the listed items Record, checked by document reviewCompliance manager with Site managerEvery year 15 May each year Disclosure, one site
Use the electronic form and signature prescribed for the filing. Signed electronic submission Record, checked by document reviewCompliance manager Every year 15 May each year Filing, one site
Measure the indicators with the methods set by the EU delegated regulation, as the Dutch rule points to it. Metering concept and KPI workbook Meter data, checked by testM&E lead with Compliance managerContinuous annual with the filing Technical limit, one site

Editions

Which text is in force, from when, and which one it replaced.

EditionStatusPublishedIn effectReplaces
Besluit activiteiten leefomgeving, article 5.16a-c Current Not statedNot stated None named

About the programme

Assessed by
A regulator or authority
Scope
data centre (one site)
Levels
500 kW installed IT power
Validity
Yearly by 15 May.
Regulator
RVO (Netherlands Enterprise Agency) administers the reporting
Who asks for it
Regulator
Where it is used
NL

Sources

Official bodies behind this page, each with the date we last read it.

No official body publishes a page for this scheme. The scheme owner's own page, linked under About the programme, is where the clauses are published.

Not legal advice. Confirm each duty against the text itself.