Data-centre rules

Data centre regulation in Sweden

Our tracker lists 11 rules for building and running a data centre in Sweden, national and EU, and 5 of them are in force.

Each comes with its status, who it applies to and the next date that matters. When a rule here changes, the change is logged below with its date.

  • 11 rules
  • 5 in force
  • 5 of 11rules that apply, in forceRegulation tracker, updated 19 Oct 2026
  • 6not yet in forceproposed, adopted or in scrutiny
  • 14 Dec 2026next date, EURegulation tracker, updated 19 Oct 2026

Rules that apply in Sweden

National rules first, then the EU rules every member state applies. Status as on the tracker.

RuleLevelStatusApplies toNext date
Act (2025:570) on disclosure of data centre energy performance, sections 3 and 4 (EED Art. 12)NationalIn force since 1 July 2025New and existing sites. Owners or operators of data centres with installed IT power demand of at least 500 kW; security-sensitive, defence and crisis-preparedness data centres exempt15 May 2027, next annual report to the EU database (2025 data was due 15 May 2026)
Act (2025:570), section 7: orders and conditional finesNationalIn force since 1 July 2025New and existing sites. Data centres covered by the reporting duty; orders may carry a conditional fineNo date published
Draft law amending Act (2014:268) on cost-benefit analyses, data centres added (EED Art. 26)NationalReferred to the Council on Legislation on 20 August 2026; no proposition listed on 15 October 2026New and substantially upgraded sites. New or substantially upgraded data centres with total installed power above 1 MWEntry into force proposed for 1 January 2027
Draft law, section 4 a: use or recovery of waste heat at data centres (EED Art. 26(6))NationalReferred to the Council on Legislation on 20 August 2026; no proposition listed on 15 October 2026New and substantially upgraded sites. Data centres above 1 MW installed power that carried out a cost-benefit analysis, if technically and economically feasibleEntry into force proposed for 1 January 2027
Energy tax on electricity, Act (1994:1776) chapter 11 section 3; data hall reduction abolishedNationalData hall reduction ended on 1 July 2023; general rate 36.0 öre per kWhNew and existing sites. Electricity used in data halls (datorhallar) is no longer eligible for the reduced rateRate recalculated from 2027; government sets it before the end of November each year
EED reporting, Article 12 and Delegated Regulation 2024/1364EUIn forceNew and existing sites. Data centres ≥500 kW installed IT power15 May 2027, next annual report
EED waste heat, Article 26(6)EUIn forceNew and existing sites. Data centres >1 MW total rated energy inputOngoing duty
EED energy management systems, Article 11EUIn force as a Directive duty on Member States; deadline not yet reachedEnterprises, including data-centre operators, with average annual energy consumption above 85 TJ (23.6 GWh) over the previous three years, all energy carriers together11 October 2027, certified energy management system in place
EU rating scheme, delegated regulation adopted 21 Sep 2026EUAdopted, in Parliament and Council scrutinyNew and existing sites. Same ≥500 kW reporting populationIn force 20 days after Official Journal publication, if not objected to
EU minimum performance standardsEUConsultation openNot yet defined14 December 2026, consultation closes
Cloud and AI Development Act, COM(2026) 502EUProposal, with Parliament and CouncilCloud and AI infrastructure providers broadlyNo fixed date

Sweden in detail

What the national rules say, with the legal texts.

Sweden's Act (2025:570) requires owners or operators of data centres with an installed IT power demand of at least 500 kW to report energy performance data to the EU database every year. It has applied since 1 July 2025. Security-sensitive, defence and crisis-preparedness data centres are exempt, and orders may carry a conditional fine. On 20 August 2026 the Government referred a draft law to the Council on Legislation. It would require a cost-benefit analysis for new or substantially upgraded data centres above 1 MW, and waste heat use or recovery where feasible. Entry into force is proposed for 1 January 2027, and no proposition is listed yet. The electricity tax reduction for data halls ended on 1 July 2023.

Dates to watch

The next dates for Sweden and the EU, soonest first.

  1. 14 Dec 2026The EU Commission's minimum performance standards consultation and call for evidence closes
  2. 1 Jan 2027Proposed entry into force of Sweden's draft law on cost-benefit analysis and waste heat use for data centres above 1 MW, if it is adopted
  3. 15 May 2027EU database dueevery year
  4. 11 Oct 2027EU deadline under Article 11 of the Energy Efficiency Directive for a certified energy management system at enterprises above 85 TJ (23.6 GWh) of annual energy consumption

Add these dates to your calendar

Formal refusals and bans since 2025

Verified decisions only.

No formal refusal or ban recorded for Sweden; absence is not evidence of low planning risk.

Decisions from 1 Jan 2025; statuses checked 21 Oct 2026.

What changed

The latest changes to these rules on the tracker, newest first.

  1. 18 Oct 2026Added to the tracker: EED energy management systems, Article 11 (In force as a Directive duty on Member States; deadline not yet reached).
  2. 15 Oct 2026Added to the tracker: Act (2025:570) on disclosure of data centre energy performance, sections 3 and 4 (EED Art. 12) (In force since 1 July 2025).
  3. 15 Oct 2026Added to the tracker: Act (2025:570), section 7: orders and conditional fines (In force since 1 July 2025).
  4. 15 Oct 2026Added to the tracker: Draft law amending Act (2014:268) on cost-benefit analyses, data centres added (EED Art. 26) (Referred to the Council on Legislation on 20 August 2026; no proposition listed on 15 October 2026).
  5. 15 Oct 2026Added to the tracker: Draft law, section 4 a: use or recovery of waste heat at data centres (EED Art. 26(6)) (Referred to the Council on Legislation on 20 August 2026; no proposition listed on 15 October 2026).
  6. 15 Oct 2026Added to the tracker: Energy tax on electricity, Act (1994:1776) chapter 11 section 3; data hall reduction abolished (Data hall reduction ended on 1 July 2023; general rate 36.0 öre per kWh).

All changes across Europe

Questions

Which rules apply to a data centre in Sweden?

Our tracker lists 11 rules for building and running a data centre in Sweden, national and EU, and 5 of them are in force.

What is the next date for data centre rules in Sweden?

The next date is 14 Dec 2026: the EU Commission's minimum performance standards consultation and call for evidence closes.

Sources

From the European data-centre regulation tracker, which cites the legal text for every rule. Data-centre market data for Sweden.

Not legal advice. Confirm each duty against the text itself.