Our tracker lists 7 rules for building and running a data centre in Ireland, national and EU, and 4 of them are in force.
Each comes with its status, who it applies to and the next date that matters. When a rule here changes, the change is logged below with its date.
- 4 of 7rules that apply, in forceRegulation tracker, updated 19 Oct 2026
- 3not yet in forceproposed, adopted or in scrutiny
- 14 Dec 2026next date, EURegulation tracker, updated 19 Oct 2026
Rules that apply in Ireland
National rules first, then the EU rules every member state applies. Status as on the tracker.
| Rule | Level | Status | Applies to | Next date |
|---|---|---|---|---|
| CRU connection policy decision | National | In force | Grid applicants. New connecting data centres | Ongoing, renewables-matching duty |
| EED reporting, Article 12 and Delegated Regulation 2024/1364 | EU | In force | New and existing sites. Data centres ≥500 kW installed IT power | 15 May 2027, next annual report |
| EED waste heat, Article 26(6) | EU | In force | New and existing sites. Data centres >1 MW total rated energy input | Ongoing duty |
| EED energy management systems, Article 11 | EU | In force as a Directive duty on Member States; deadline not yet reached | Enterprises, including data-centre operators, with average annual energy consumption above 85 TJ (23.6 GWh) over the previous three years, all energy carriers together | 11 October 2027, certified energy management system in place |
| EU rating scheme, delegated regulation adopted 21 Sep 2026 | EU | Adopted, in Parliament and Council scrutiny | New and existing sites. Same ≥500 kW reporting population | In force 20 days after Official Journal publication, if not objected to |
| EU minimum performance standards | EU | Consultation open | Not yet defined | 14 December 2026, consultation closes |
| Cloud and AI Development Act, COM(2026) 502 | EU | Proposal, with Parliament and Council | Cloud and AI infrastructure providers broadly | No fixed date |
Ireland in detail
What the national rules say, with the legal texts.
Ireland's Commission for Regulation of Utilities, the CRU, published a decision on 12 December 2025 covering new data centres applying to connect to the electricity grid. According to the CRU, data centres seeking a new connection will be required to provide on-site or near-site dispatchable generation or storage matched to their requested import demand, and to match at least 80% of their annual electricity demand with additional renewable-electricity projects. The decision paper sets how these duties scale with the size of the requested connection.
Dates to watch
The next dates for Ireland and the EU, soonest first.
- 14 Dec 2026The EU Commission's minimum performance standards consultation and call for evidence closes
- 15 May 2027EU database dueevery year
- 11 Oct 2027EU deadline under Article 11 of the Energy Efficiency Directive for a certified energy management system at enterprises above 85 TJ (23.6 GWh) of annual energy consumption
Formal refusals and bans since 2025
Verified decisions only.
Area-wide rules
- 12 Dec 2025 Ireland, nationwide New large grid users must bring on-site or nearby dispatchable generation or storage and match demand with new Irish renewablesIn force
Decisions on single sites
- 15 Oct 2026 Kilmeaden, County Waterford Planning application refused by the councilRefused; no appeal lodged as of 21 Oct 2026
- Sep 2026 Killala, County Mayo Council permission overturned on appeal by the national planning boardStanding
- 4 Apr 2025 Clondalkin, near Dublin Refused on appeal by the national planning boardStanding
- 19 Feb 2025 Clondalkin, near Dublin Refused on appeal by the national planning boardStanding
Decisions from 1 Jan 2025; statuses checked 21 Oct 2026.
What changed
The latest changes to these rules on the tracker, newest first.
- 18 Oct 2026Added to the tracker: EED energy management systems, Article 11 (In force as a Directive duty on Member States; deadline not yet reached).
Questions
Which rules apply to a data centre in Ireland?
Our tracker lists 7 rules for building and running a data centre in Ireland, national and EU, and 4 of them are in force.
What is the next date for data centre rules in Ireland?
The next date is 14 Dec 2026: the EU Commission's minimum performance standards consultation and call for evidence closes.